|
 |
 |
 |
 |
|
Jan 2011 Start Guest
Room 1 |
And a few weeks later |
It's done |
February - trip to the
UK for shopping and pick up the car. |
 |
 |
 |
 |
|
Maintenance ready for
cutting the grass |
March - This was our
view from the kitchen window |
Unfortunately, high
winds dislodged the back wall and the roof started to fall off |
And it very quickly
deteriorated from there so I had no choice really |
 |
 |
 |
 |
|
Also removed the old
swimming pool pump structure |
Then the concrete base |
And this is the
kitchen view we ended up with. |
The domestic
management does not like Ivy, so that was next. |
 |
 |
 |
 |
|
April - Guest room 2 |
New ceiling and lots
of wall prep |
but after a few coats |
of paint |
 |
 |
 |
 |
|
All done. |
End of April and Fosse
Ops commence |
Tons of sand |
and stones required
for this job |
 |
 |
 |
 |
|
as well as a 4000
litre tank and pipes |
Start with a hole in
the hedge |
Then a hole for the
tank |
Then a hole for the
pipes |
 |
 |
 |
 |
|
In go the pipes |
and the sand and the
stones |
cover it all over |
We turn our hand to
everything over here |
 |
 |
 |
 |
|
And all done |
These are |
the views we used to
have |
before fosse ops
started. |
 |
 |
 |
 |
|
A little closed in |
and lots of shadows |
These are the views
post fosse ops |
Fantastic vista |
 |
 |
 |
 |
|
and lots of light |
has really changed the
look of the house |
both inside and out. |
June and here's that
digger operator spraying the fruit trees. |
 |
 |
 |
 |
|
Fosse Ops also gave us
the opportunity to |
trim some of the trees
and produce some fire wood |
26 June New lounge
wood burner installed |
August - Matthew,
Ellie and George visit |
 |
 |
 |
 |
|
August - September
Bathroom |
Remove wall & floor
tiles |
Dig up floor and move
drains & pipes |
Lay concrete floor |
 |
 |
 |
 |
|
Tile floor |
Tile walls |
Then grout, grout and
more grouting |
Bath, sink & shower
screen |
 |
 |
 |
 |
|
New shower |
September - Emma, Dave
and Archie visit |
Archie playing with
shutters |
I think this is a
Dragon stick !! |
 |
 |
 |
 |
|
Archie sitting next to
our old man garden ornament |
Original boiler with
dividing wall to workshop |
20 September- Boiler
wall removal |
24 September -
Workshop window removal |
 |
 |
 |
 |
|
New bigger hole
required because |
26 September - Solar
heating installation starts |
Jen standing by
new tank |
Solar heating roof
panels |
 |
 |
 |
_small.JPG) |
|
30 September - New
wood boiler, controls and tank |
2 October - New
workshop window |
Remove rest of
wall between boiler and workshop ready for new workshop layout. |
This is Stumpy on
the left and Knobbly on the right, Jen's favourite old tree stumps
that she has been trying to get rid of since we arrived. |
_small.JPG) |
_small.JPG) |
_small.JPG) |
 |
|
Well, an
afternoon with a chainsaw and some ropes |
and a lot of
effort |
and she gets her
wish - gone (from the skyline at least) |
Last job for the
bathroom was to fit the radiator |
 |
 |
 |
 |
|
having rerouted
the pipes through the WC to provide some heating in that room. |
October 15th and
we changed our Broadband supplier. 8/2Mbps compared to
previous 20kbps, worse than dialup and half the cost. |
Having had a
little rain in October I was able to identify areas of the roof that
needed attention. |
The orange
chimney is no longer required |
 |
 |
 |
 |
|
and takes up a
fair bit of space in the workshop |
So I removed it,
patched up the roof and as well as giving me |
more room in the
workshop it looks much tidier outside as well. |
New shutters for
new workshop window. |
 |
 |
 |
 |
|
Start of bottom
field work. Move old wall rubble to field |
to make a nice
slope from the road. |
November 1st
and Gerry & Vicky visit for a few days |
delivering my
pneumatic pump up antenna mast |
 |
 |
 |
 |
|
and collecting a
few bits and pieces |
that we no longer
require to take back home. |
Hard work but
certainly cleared out my workshop. |
18th November and
we get our first log delivery |
 |
 |
 |
 |
|
which took 2
hours to move. Notice new log splitter in garage. |
22 November and
we finally clear the last of the front garden path |
and then move on
to widen the drive moving the earth to |
the bottom field
to make the slope. |
 |
 |
 |
 |
|
Also moved our
collection of rocks and stones to the bottom field to help construct
the slope making room for next log delivery. |
Time to put the
modified wind generator back up |
This time at 40
ft so used one of our spare telegraph poles(!!) |
Hope it works
better at this height. |
 |
 |
 |
 |
|
November 25th and
final use of digger to dig trench |
for solar panels
and wind generator cables |
November 28th
Remove pen from chicken shed and tidy up area |
November 29th
Flatten earth I moved from the drive dig out to fill |
 |
 |
 |
 |
|
in the French
Drains that run across the top field - made cutting the grass very
difficult as the lawn mover used to fall into them. |
1st December -
New toy, wood moisture meter. Supposed to identify wood ready
to burn but even growing trees give the same reading!! |
11th December -
Put the geraniums to bed for the winter |
Wind turbine
works really well but I think the 3 phase ripple blew up the
transient protection on the Tri-Star whilst generating 30 amps |
 |
 |
 |
 |
|
Tri-Star advise against using it in
charging mode for wind generators so I reconfigured it for
"Diversion Control" mode. This is the temporary dump load - 5
metres of 1mm2 cable as
a 0.39 ohm heating load. |
Samantha's first visit - Driver
training for future working holidays !!! |
16th December -
Storm "Joachim" left it's mark on Bonnifont removing roof tiles,
ripping down light fittings and |
devastating the
Wind generator and the solar tracker array |
 |
 |
 |
 |
|
Ripped the concrete blocks out of the
ground. Only lost 1 solar panel and smashed the solar detector
dome |
I didn't think the 40ft arrangement
would withstand a storm - I was right despite 8 extra guy ropes. |
Put a really nice
bend in the lower tube though but also cracked the fan casting and
bent one of the blades |
bent the rotating
shaft |
 |
 |
 |
 |
|
and the generator main shaft |
Worst was the flood water |
We normally can't
see the river through the trees |
but this was the
view from the bottom of our lower field |
 |
 |
 |
 |
|
All of this is normally grazing land
for cattle |
We also had a river running along the
back of the house |
which overflowed
the tanked wall and ran through the back bedrooms |
but this only
lasted for 30 minutes. Anyway, no one hurt so no problem.
It can all be put right. |
 |
 |
 |
So - That was
2011, our first full year living in France.
And what
do we think of our little life changing adventure now?
Rural France -
Best kept secret of the EU if you ask me.
Whish I'd have
learnt of it years before |
|
Christmas time - a nice warm fire |
and Christmas decorations |
And here we are again
- our 2nd Christmas at
Bonnifont. Fantastic year |
|