Chez Moi - Bonnifont - 2012   A record of what happens, as it happens......well almost !

12th January - New Heating controller for radiator system 17th January - 6 tonne of Calcaire for drive base coat 20th January - Spread over new drive area recovered from old fosse area of garden
BUT - before we could whack it down the snow arrived early Sunday morning 5th February Very pretty but it stopped all outside work
13th February - tried to fit new ground anchors for new wind turbine but had to wait until 14th February when the snow melted and the ground thawed 15th February and new turbine on-line
17th February - Finally able to get on whacking down the Calcaire base coat All ready for 24th February when 8 tonne of top coat delivered
This was spread across the complete driveway using spade, wheelbarrow and rake Hard work but really finishes off the front
and side of the house Been wanting to do this since we moved in 28th Feb- last bonfire ready for bottom field grass sowing 29th February  and garden maintenance commences with leaf hoovering
Antenna erected for 6/2/70cms 3rd March and we acquire two new tools 10th March plough bottom field ready for sowing grass seed
       
11th March Emma, Dave & Archie visit and do little boys love tractors ? 21st March - Mains inverter installed - just in case 28th March some spare top soil for the bottom field
which covers up the rubble used to create the slope spread it around a bit with the right equipment and then level off
Just need the grass to grow now 29th March and time to move the solar tracker tripod and rewire the 12 volt supply cables bought 3 of these garden seats for the summer
New  hedge trimmer as the battery one can't cope 20th April John & Kathy visit and we have  a day out tasting cognac 28th April It just rained and rained but not as bad as the weather was in the UK
1st May Guest Room 2 roof tile repair The corrugated roof sheets were falling apart and had let all that rain through onto the ceiling of a room we had already decorated
I tried to save the ceiling but it just fell down Still, some placoplatre, filler and paint and we are back in business ready for the summer 22nd May and time to play - pneumatic 40 ft mast
Angle iron bolted through the workshop wall to provide the fixings for the angle iron support and "hey presto" instant 40 ft antenna support 26th May -  back to work fitting "man cave" roof light
This is prep for creating the new Radio Room and lets loads of light into the room 27th May and we fit the workshop roof light First one took 6 hours and the second only 3
This was a path we removed last autumn and this is how it looks on 31st May New strimmer - don't have enough extension leads May 31st - Bottom field WITH GRASS
Solar hot water. Only 1 pellet burn during May 2 June The 4*4 is really useful when the mowers break down.  Most things get fixed over here.  Really pleased I bought
a welder to France. 7 June Our dear friend Graham's 60th birthday More food and drink I'm afraid 14 June Roof repairs. Thanks Nigel.
15 June Paint kitchen shutters 21 June Sam & Luke arrive Sam playing @ 4*4 driving 23 June Chatain boules
and sam seems to be winning all good fun in the sun and in the evening a BBQ Everybody brings some food
and we all share. Bonfire afterwards A really great community day 24 June Sam cutting the grass for me and trying out both mowers
A walk along the river Charente You can tell she's a country lass and a BBQ to end the day Coffee @ Confolens
and a walk across the bridge over the river 26 June Dinner @ Porte bleu Verteuil that also has a fantastic Chateau 5 July Building materials delivery for workshop
9 July Ellie & Steph on holiday 10 July Dinner @ Porte bleu Will the real Marylyn please "STANDEY UPPEY" 11 July Steph trying 4*4 driving
as does Ellie and Matt and Chris who have also arrived 12 July Chinese in Rufec
makes a nice change in rural France 14 July Bastille Day - A BIG holiday in France A really nice day with loads of food and drink
15 July A walk around Bonnifont 17 July Jen & kids go to Euro Disney for the day While I carry on building in the workshop
18 July Charente Lakes for the afternoon 19 July Dinner @ Edna's 30 July Fit Chimney cap to stop rain down the chimney 1 August Start Workshop stud wall
All timber recovered from old sheep pen Thought about how to do this skylight for months New wall to form separate radio shack and workshop Stud walls well insulated to stop boiler noise
7 August Study Group BBQ 21 guests all bringing their own food and drink which Kevin and I cooked on two BBQ's.
A fantastic evening with really good company.  Looking  forward to the next one. Workshop stud wall taking shape Polystyrene backed plasterboard for insulation
on exterior walls to cope with -15o C winters 13 August    Jen's Birthday Man cave "Shack" flooring 24 August Gemma, Rob & family visit
25 August reconnect battery bank 26 August 3 cords of firewood ready for the winter Furniture into shack Clearout Pig Pen
and hard standing for firewood storage 2 September All firewood stacked in Pig Pen Even finding time for some of the little jobs now like a new loo seat and co-ordinated loo roll holder  and an improved method of storing the welly boots
New radio operating desk and this is the only time the workbench will look as tidy as this After four years my radio equipment is now out of boxes My birthday celebration.  Kevin & Sue dressed as pirates
and we all had a great evening with fireworks!! Back to work - Stud wall dividing Guest Room 3 from the new utility room Utility room wall which now needs a new door Hey presto! A utility room door.  I really hope this is the last time I need to knock French wall bricks out
Painting the new utility room And I even get a new stool for sitting at my workbench Utility room (hereinafter referred to as the Belfry) with worktop fitted 28th September - Holiday time - a few days at Gerry and Vicki's
       
Back home and unpacking the winemaking kit prior to relocation to the Belfry 4th October - Playtime.  New 2m 10 element beam assembled and fitted to pump-up mast Oh Yes!!
16 October and Emma, Dave and Archie arrives for a week's break 18th October - Belfry operational 19th October - Work commences on new Guest Room 3 Repair small wind generator cable fault
23 October 2 days of repairing roof leaks 25 October Finally time to sort out the slope to the grass 28 October 8 bags of sand later - much better 18 November GR3 finished
Even fitted the window blind very pleased this room is now complete Because GR3 is now complete GR2 is now back in service This room hasn't looked like this for a long time
and very pleased this room is back in service. 28 November - East corridor skylight insulation panel and two insulation panels for the shack 6 December - Emptying the pneumatic mast of water
7 December - More plasterboard for the east corridor walls 9 December - and not long before it's fixed to the walls.  Only 2 hours for the paste to go off 11 December - Jen making mince pies for our DIY Carol Concert
Great fun with a sing-a-long carol service with live keyboard accompaniment 13 December - back to work plaster boarding the last of the workshop Helps keep the heat in 18 December Pere Noel visits the children of Chatain School
22 December Live nativity  for Chatain commune followed by an evening Christmas bring and share meal 25 December - And here we are again.  Our third Christmas in France. 27 December - This seems to becoming an annual event.  Very gusty winds ripped the lamp out of the old summer kitchen again.
     
31 December - New Years Eve celebrations