 |
 |
 |
 |
|
6 Jan - we start
the year off with me dropping eggs but what luck ! |
10 Jan - Jen's doing puzzles again |
13 Jan - No flying today. Just the
airport fogbound |
14 Jan - Time to update our bedroom.
Remove existing en-suite and build a new one. |
 |
 |
 |
 |
|
So first we move into GR1 bedroom |
and then prep our bedroom. This will
be a long project. |
15 Jan - Our first frost of the
winter. |
First job is to remove shower
enclosure |
 |
 |
 |
 |
|
then turn off the water and remove
the shower tray and sink unit |
and here we hit our first snag.
We've had an intermittent leak into the kitchen for 5 years |
but I thought I'd fixed it. NO! It's
been leaking for a long time and has made a bit of a mess of the
flooring. |
Jen keeps out of the way by keeping
busy. A Cluedo puzzle. |
 |
 |
 |
 |
|
18 Jan - Leave the floor for now to
let it dry out a bit and continue removing the toilet partition. |
It was well constructed,
exactly as I would have done it, so it takes a while |
20 Jan - to remove saving the 4*2
timber as we go |
27 Jan - That's the walls down.
Now for the old tiles. |
 |
 |
 |
 |
|
29 Jan - A modification to the Radio
room heating system. Add a 2 way motorised valve. |
We also need to keep the "puzzler"
happy so spray paint the edges of the next puzzle frame |
ready for the next puzzle |
5 Feb - Sink tiles removed complete
with extra layer of plasterboard |
 |
 |
 |
 |
|
6 Feb - then remove the toilet wall
tiles |
This is the kitchen hob extract fan
pipe half in and half out of our bedroom wall. This will come
out. |
Three phase fuse box in the old
toilet area. Needs tidying up. |
Back to the floor. Remove rotten
sections and treat with stuff to kill the spores. |
 |
 |
 |
 |
|
12 Feb - Jen has decided to try out a
new hobby |
17 Feb - Local management decided we
needed a new lamp fitting for GR1. |
So here we go. Got nothing else to
do! |
And I also discover that our heating
system has lost all water pressure. Traced to a rusty hole in
the bottom of the expansion tank. |
 |
 |
 |
 |
|
23 Feb - Meanwhile, Jen is still at
it as well. |
The floor is dry so make good with
new wood and get back to the job in hand. |
24 Feb - The new bits are starting to
arrive |
but we have plenty of temporary
storage space. |
 |
 |
 |
 |
|
Replace the flooring chipboard over
the old floor |
1 March - More diversions.
Jen's car has developed a very loud humming noise. Methinks
it's a wheel bearing. |
The new expansion tank arrives. |
Time to check our planning
dimensions. Just need to build the walls now! |
 |
 |
 |
 |
|
7 March - I can't remember how long
I've had my study chair. Probably since 1995. |
It's finally given up so I treated
myself to a new one. |
Time to fit the new tank. Took
the opportunity to move it's position next to the main tank. |
9 March - She's defiantly got the
puzzle bug this year! |
 |
 |
 |
 |
|
12 March - Start the studd work for
the shower end |
14 March - so I can get the
plasterboard up and check the shower tray fits. |
18 March - I decided to replace the
copper water pipes with plastic. Much easier to work with and looses
less heat. |
22 March - New door frame and side
wall. |
 |
 |
 |
 |
|
23 March - Very nice having large
areas to measure and cut the plasterboard. |
Had to get the big pieces of board in
before I finished the outside wall. |
24 March - Almost there with the
room. |
25 March - Extract pipe removed. |
 |
 |
 |
 |
|
26 March - We decided to go back to
making our own bread. So, new machine. |
30 March - Rewire the fuse box
removing surplus bits. |
3 April - Off the cuff navigation
exercise during my flying lesson saw us overflying Bonnifont. |
New floor covering laid |
 |
 |
 |
 |
|
6 April - I hate doing this! However,
tile for shower taps prepared. |
Shower base levelled and glued in
place. |
Start to smarten up the walls where
the tiles were removed. |
Fit the first shower enclosure tile
around the taps. |
 |
 |
 |
 |
|
Then cut and fix the others. |
Fill holes left by old shower and
kitchen extract |
17 April - Now I
just have to grout it all! |
Fill in the holes
left by removing old tiles |
 |
 |
 |
 |
|
19 April - Not
sure Spring has arrived here yet but, time for the new hanging
basket replacement. |
Whilst I was
doing the basket I noticed this. Our old redundant fosse tank
collapsing. Add to the list! |
It's dry enough
to start my grass cutting but this time with my new kit. |
You can see how
much it cuts in one go. I would have had to "nibble" away for
10 minutes with the "ride on" to make this little cut. |
 |
 |
 |
 |
|
Geranium time as
well today. |
20 April - fix
the toilet and cover the old fuse box |
21 April 14:00 -
First solo flight in this plane |
23 April - Shower
door fitted |
 |
 |
 |
 |
|
26 April - Fit
the sink & unit & mirror/light |
29 April - Ready
for sanding and painting |
30 April -
Actually feel as if I'm getting there now. |
5th May 16:00 -
OK, Finished |
 |
 |
 |
 |
|
After the roof is
replaced in August I can decorate the rest of the bedroom |
Not that
different, why did it take so long? |
Before the divider was removed
(November 2014) |
6th May - Now all
I have to do is clear up the workshop |
 |
 |
 |
 |
|
and the garage.
Not yet though! Time for a break. |
8 May - We vacate GR1 and move back into |
our bedroom. |
12 May - And we
decide one wall basket looked a bit lonely, so we added another one. |
 |
 |
 |
 |
|
16 May - Whilst
grass cutting I notice the engine getting too hot. Before I
could even take a look-see |
blew a coolant
drain hose. Grass cuttings had blocked the radiator grill.
Found some pipe, cleaned the grill and off we went again. |
21 May - The
first decent day of weather this year (28 degrees) and we get a
storm !!! |
23 May - Fan dipole broken. Add to
the list! |
 |
 |
 |
 |
|
Flail mower maintenance |
Garage tidy-up post en-suite ops |
24 May - Jen's latest puzzle |
26 May - Important for us, our EU
votes |
 |
 |
 |
 |
|
Workshop tidy-up post en-suite ops |
4 June - Murder
Mystery weekend @ Rhinefield House, New Forest |
Great fun and
afternoon tea & scones afterwards |
We didn't do too
bad either! |
 |
 |
 |
 |
|
Rear of
Rhinefield House - lucky with the weather as well |
8 June -
Flambards with the girls |
I can't do the
rides any more so Jen has to step in |
I can still do
the Merry Go Round though |
 |
 |
 |
 |
|
and still look
after the non riders |
Grandad @ the
beach - reminds me of doing this with Sam a long time ago! |
Grandchildren -
great excuse for playing in the sand |
10 June - we
spend a night at the Jamaica Inn |
 |
 |
 |
 |
|
on the way back
to Portsmouth |
14 June - Back
home with a bit of shopping |
20 June - Jen
busy again |
21 June -
Pressure washer maintenance |
 |
 |
 |
 |
|
24 June - getting
to grips with the grass after our UK trip |
25 June - "T"
shirt from the girls |
Bottom field
dipole antenna repaired |
30 June - Grass
really quick to cut now it's under control |
 |
 |
 |
 |
|
9 July - Maverick
back in the garage for another attempt to fix it |
two years I've
been trying to fix this |
Been through
virtually everything from filters to engine management control |
and this was the
culprit. A blocked tiny gauze filter buried inside the injection
pump |
 |
 |
 |
 |
|
15 July -
Watching Matt's graduation on-line |
17 July - My
FT8800 radio with two broken control knobs renders it useless |
A web search and
a 'phone call to Yaesu @ Winchester results in two new controls |
A bit of
desoldering to remove the broken controls |
 |
 |
 |
 |
|
then solder the
new ones in place and |
FT8800 repaired
and as good as new |
17 July is the
first day this year that the solar heating has managed to heat up |
the domestic hot
water tank to 80 degrees C |
 |
 |
 |
 |
|
19 July - Jen's
puzzling again |
you can see the
rain on the steps |
23 July - Gerry &
Vicky's 50th Wedding Celebration @ Bais |
Fantastic food
and company, A really nice evening |
 |
 |
 |
 |
|
Breakfast on the
street for us as we booked a room overnight. Merci Le Lion
d'Or |
29 July - Cut all grass in 6 hours -
Brilliant machine |
3 Aug - Tractor maintenance |
and Flail mower maintenance |
 |
 |
 |
 |
|
4 Aug - I gave up trying to use nice
chemicals |
and bought a pressure washer |
should have done it years ago. |
8 Aug - Now it's clean I can paint
the wall |
 |
 |
 |
 |
|
9 Aug - Jen's latest puzzle |
18 Aug - Matt, Ellie & Josefine
summer visit |
20 Aug - Solar panel circuit pressure
loss. Loose valve |
29 Aug - Decorating Ellie's flat |
 |
 |
 |
 |
|
with a little help from her friends |
13 Sept - New roof work commences |
21 Sept - All complete |
No more buckets and tubs for the
leaks |
 |
 |
 |
 |
|
and it blends in not looking like a
new roof |
24 Sept - Winter logs delivery |
25 Sept - Winter logs stacked away |
27 Sept - Roof Complete |
 |
 |
 |
 |
|
with new mezzanine velux window |
and 2 new bedroom velux windows |
28 Sept - Post roof clean-up |
12 Oct - These are cuttings from the passion flower that cascaded
over the front of our house in Netley Abbey taken from my mum in
Hythe. Hope they survive. |
 |
 |
 |
 |
|
13 Oct - Bedroom velux surrounds and ceiling beams |
No more insects falling through the ceiling |
16 Oct - Move back into the much brighter bedroom |
and a new
bookcase to hold all the jigsaw puzzles |
 |
 |
 |
 |
|
1 Nov - First Christmas puzzle of this year |
7 Nov - Flail Mower bearings gone so |
disassemble and order new ones (from Amazon!!!) |
10 Nov - Jen's next Cluedo Puzzle |
 |
 |
 |
 |
|
14 Nov - Jen's first 3D puzzle
ever and it's a Christmas one |
and the bearings arrive from Amazon for the Flail Mower |
15 Nov - All nine Flying Ground School Exams completed |
18 Nov - WTA 125k Tennis @ Limoges |
 |
 |
 |
 |
|
A treat for my long suffering wife |
who sits at home all day whilst I go off flying |
We watched three matches. The middle one was Caroline Garcia v Donna
Vekic |
I know somebody who really enjoyed themselves |
 |
 |
 |
 |
|
26 Nov - Jen finally completes a
puzzle she's had for over seven years - oh, and it's a Christmas
one! |
27 Nov - Time to winter the Geraniums |
and tuck them up for the winter |
28 Nov - It's not even December yet but someone's getting excited |
 |
 |
 |
 |
|
1 Dec - And we're off! Out comes the
tinsel |
the 3D puzzle and Christmas Train Set |
the cushions with LED's |
the Christmas lights |
 |
 |
 |
 |
|
the twinkling picture
(if you
click this it might play an mp4 file) |
and the Christmas table cloth. It's
beginning to look a lot like ummm!!! |
5 Dec - My
retirement clock packs up for the second time. Seems the
movement only lasts about six years. New one fitted with sound
reduction during the night |
6 Dec - Time to
replace the Leylandi trees we lost during the dry summer but guess
what, the Maverick decides to pack up again. |
 |
 |
 |
 |
|
So, use the
Renault again to transport ten trees up to the top field and plant
them out. |
15 Dec - I gave
the apple tree a trim last year and it seemed to like it so thought
I'd be a bit more adventurous this year |
19 Dec - Solar
heating expansion tank springs another leak so time for a new tank. |
disconnect from
above the main water tank |
 |
 |
 |
 |
|
remove the brass
fittings and |
fit them to the
new tank and reconnect. |
Christmas Carols
at Civray Church with minced pies and mulled wine afterwards in the
Sal |
Get the tables
out, add Christmas table cloths and minced pies |
 |
 |
 |
 |
|
then distribute
the mulled wine to all those who were frozen from being in the
church for an hour |
Then we just
clear it all away again. Job done for another year. |
20 Dec - My favourite HF
radio's back-up battery goes flat after six years. |
So order a new
one, strip the radio down. Locate the battery and change it. |
 |
 |
 |
 |
|
Brill, Good
as new for another six years! |
We've even got Christmas Toilet paper
this year! |
25 Dec - Christmas lunch again -
GREAT |
31 Dec - Really bad fog for several
days. Couldn't see across the field and gave a really weird
feeling. |
 |
Another fabulous year living in
Bonnifont. We thank our lucky stars we lead such a wonderful life
here in France. |
|
|
|
We have had a spate of Break-ins
locally, some whilst the occupants are awake and moving around their
house so I decided to beef-up security by installing an alarm
system. |
|
|
|